It takes the average reader 4 hours and 15 minutes to read Practical Schedule Risk Analysis by Dr David Hulett
Assuming a reading speed of 250 words per minute. Learn more
Project scheduling is required for good project management, and the schedule represents the project plan under a specific set of assumptions, often that it will avoid new risks or even those that have occurred on previous occasions. The typical Critical Path Method (CPM) schedule assumes that the project team knows how long the scheduled activities will take. Yet, the experienced project manager knows that duration values so precisely stated are actually only estimates based on assumptions that could be wrong. A schedule risk analysis explores the implications for the project's schedule of risk to the activity durations and also identifies the most important schedule risks. This analysis, building on and extending CPM scheduling, will result in a more accurate estimate of completion and provide an early opportunity for planning effective risk mitigation actions. Practical Schedule Risk Analysis contains a complete treatment of schedule risk analysis from basic to advanced concepts. The methods are introduced at the simplest level: ∗ Why is the duration uncertain? ∗ And how do we represent this uncertainty with a probability distribution? These are then progressively elaborated: ∗ How does uncertainty of activities along a path lead to more uncertainty of the path's completion date? ∗ How can a schedule with parallel paths be riskier than each of the paths individually? ∗ How can we represent risks about activities that are not in the schedule at all? Culminating in a discussion of the most powerful and advanced capabilities available in current commercial software. Schedule risk analysis is a process that is industry-independent, and the methods explained in this volume have been used by the author with positive effect in such industries as construction, oil and gas, information systems, environmental restoration and aerospace/defense. The result is a book that is not only highly practical; something that people within all types of projects and in all industries can apply themselves; but that is an extraordinarily complete guide to creating and managing a rigorous project schedule.
Practical Schedule Risk Analysis by Dr David Hulett is 248 pages long, and a total of 63,984 words.
This makes it 84% the length of the average book. It also has 78% more words than the average book.
The average oral reading speed is 183 words per minute. This means it takes 5 hours and 49 minutes to read Practical Schedule Risk Analysis aloud.
Practical Schedule Risk Analysis is suitable for students ages 12 and up.
Note that there may be other factors that effect this rating besides length that are not factored in on this page. This may include things like complex language or sensitive topics not suitable for students of certain ages.
When deciding what to show young students always use your best judgement and consult a professional.
Practical Schedule Risk Analysis by Dr David Hulett is sold by several retailers and bookshops. However, Read Time works with Amazon to provide an easier way to purchase books.
To buy Practical Schedule Risk Analysis by Dr David Hulett on Amazon click the button below.
Buy Practical Schedule Risk Analysis on Amazon